Tuesday 15 May 2018

Tuesday 15th May 2018 day 9

Day 9
Today is also a sunny and hot day but students have done a good job. While old tasks were going well, some new tasks were began at different fields.

Generaly tasks today include:
•Geochemistry 
•Test pitting 
•Geophysics 
•Recording(photos &drawing)
•General finds cleaning.

On the grass-field, the work of test pitting in trench were continued as previous day. Students opened three new test pits with Tim. Others were focusing on cleaning the top soil of old test pits. Some test pits were expanded and dug deeper which show different color of nature and artifacial soil.

In trench 7, the students finished cleaning sureface and took photographs. In trench 8, they were drawing the trench surface. Trench 9 was probably an entrance or gate so students expanded to 1 meter in length and 0.5 meter in width.

Geophysics & Geochemistry kept working on new grass-field and they did well.


Clear difference between nature and artificial soil

Concentrating on drawing

Expanding work in trench 9

Taking photographs in trench 7

Finding in trench 9(part of arrow head)